Winter Working Range

Keep rendering through winter.

Two products built for cold, damp UK sites. Raso W160 Winter skim coat and adhesive, and 4Seasons Silicone Render Enhanced topcoat, both applied from +1°C with no additives. Base, reinforce and finish an EWI system from November to March without waiting for the weather.

+1°C
Minimum application
No additives
Winter formula as standard
High humidity
Applies in damp conditions
6 branches
In stock all winter
Skim coat and adhesiveRaso W160 Winter
Silicone topcoat4Seasons Silicone Render Enhanced
Application range+1°C to +35°C
AvailabilityAll six Licata branches
The Winter Range

Base, reinforce and finish from +1°C

Standard renders and basecoats stop curing when the temperature drops, and most data sheets stop at +5°C. Raso W160 Winter and 4Seasons Silicone Render Enhanced are formulated for low temperatures and high humidity, so the full EWI build-up from board bonding to finished facade can continue through the coldest months.

Raso W160 Winter fibre-reinforced skim coat and adhesive, 25 kg bag
Layer 1: bond and reinforce

Raso W160 Winter

Fibre-reinforced skim coat and adhesive, certified for licataTHERM ETA / EAD systems
+1°C to +35°C
Application
4 to 6 kg/m²
Skim coat consumption
Over 30 min
Workability at 20°C
Grey or white
25 kg bag
4Seasons Silicone Render Enhanced, 25 kg bucket
Layer 2: finish

4Seasons Silicone Render Enhanced

Ready-to-use siloxane topcoat (Siloxan Render 4S), high water repellency, high vapour permeability
+1°C to +35°C
Application
Approx. 2.6 kg/m²
1.5 mm grain
3 to 4 hours
Touch dry
600+ colours
25 kg bucket
Why it matters

What a winter formula changes on site

Work from +1°C, not +5°C

Most standard products are limited to +5°C and above. Both winter products apply from +1°C, which keeps the majority of UK winter days workable instead of lost.

No winter additives

The low-temperature performance is in the formula. Nothing extra to buy, dose or get wrong on site, and the certified system build-up stays as tested.

Handles damp air

4Seasons is designed for high relative humidity, and Raso W160 Winter is built to cure in cold, damp conditions where a standard basecoat would stall.

Programme certainty

Contractors on funded retrofit programmes carry fixed completion dates. A winter-rated system means those dates do not slip because of a cold snap.

Same system, same certification

Raso W160 Winter is certified for licataTHERM ETA / EAD systems. The winter range slots into the existing build-up rather than replacing it with something unfamiliar.

Cashflow through the quiet months

Rendering teams typically lose December to February. Keeping crews productive on winter-rated products keeps invoices going out when they usually stop.

Winter Working Guide

What to expect at each temperature

Published data refers to 20°C. Colder air and higher humidity slow drying and curing on every product, including winter-rated ones. Use this as a planning guide and check ambient, substrate and material temperature before mixing.

Site temperatureRaso W160 Winter4Seasons Silicone Render EnhancedNotes
Below +1°C Do not apply Do not apply Do not apply to frozen or thawing substrates. Check the overnight forecast: the substrate must stay above +1°C while the product cures.
+1°C to +5°C Apply Apply Expect extended workability and slower drying. Allow longer between coats and protect from rain, wind and overnight frost for at least 48 to 72 hours.
+5°C to +15°C Apply Apply Typical UK autumn and spring conditions. Drying slower than published 20°C figures. Avoid application in fog, mist or persistent high humidity.
+15°C to +35°C Apply Apply Standard conditions. Shield from direct sun and drying wind. Published drying and curing times apply at 20°C.
Before you start

Winter site checks

1
Check three temperatures: ambient, substrate and the material itself. All three need to be within +1°C to +35°C at application and through curing.
2
Read the overnight forecast. A frost after application damages fresh material. If the substrate will drop below +1°C overnight, protect the elevation or wait.
3
Store material above +5°C. Keep bags and buckets in a dry, sheltered store. Do not use product that has frozen.
4
Substrate must be dry and sound. No frozen, thawing, water-filmed or saturated backgrounds. Prime where the TDS calls for it.
During and after

Application in the cold

1
Mix with clean water only. No antifreeze, accelerators or other additives. The winter performance is already in the product.
2
Allow longer between coats. Raso W160 Winter needs at least 24 hours between skim coats at 20°C. In the cold, confirm the first coat has hardened before applying the second.
3
Finish each elevation in one pass. 4Seasons topcoat applied in stops and starts can show colour variation. Plan the crew and the scaffold so an elevation is completed wet-on-wet.
4
Protect for 48 to 72 hours. Shield fresh work from rain, wind, direct sun and overnight frost. Debris netting or sheeting on the scaffold is the minimum.
Note: Do not apply either product in fog, mist or persistently high humidity, even if the temperature is within range. Moisture in the air slows curing and can affect the final appearance of the topcoat.
Availability

In stock at all six branches

Both products are stocked through the winter at every Licata branch for collection, with delivery across each branch zone. Call your branch to reserve stock ahead of a cold snap.

Twickenham
Head office, West London
Southgate
North London
Dartford
Kent, South East London
Wickford
Essex
Birmingham
West Midlands
Manchester
North West

Branch addresses, opening hours and phone numbers

Price up a winter job

Send us the elevation areas and the system, and we will quote Raso W160 Winter and 4Seasons Silicone Render Enhanced from your nearest branch.