The curing time of a basecoat depends on the type of render system, substrate and weather conditions. Typically, Licata basecoats within external wall insulation systems need around 24 to 48 hours to dry before the finishing render is applied. This allows the reinforced layer and adhesive mortar to achieve full bonding strength and weather resistance.
In colder or more humid conditions, curing may take slightly longer. Contractors are advised to ensure the base coat is completely dry, firm and free from moisture before proceeding. Correct curing helps maintain long term performance, durability and a smooth, high performance finish across both residential and commercial installations.



